Kernaussage: 1.
2026-08-24 - LD Hamburg - Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung
v.
HMD Global - UPC_CFI_494/2025
1. For competition law reasons, the patent holder is only required to indicate to the
patent user one licensing route that satisfies the FRAND requirements (concurring
with LD Munich, decision of 18 December 2024 – UPC_CFI_9/2023 – Huawei v
Netgear, p. 136).
2. However, there are constellations where the implementer can demand a bilateral
licence instead of a pool licence. Such constellations are for example, but non
exclusively, given when the implementer expressed its desire to obtain a multi
standard-licence or to sign cross-licencing agreements with the individual patent
proprietors. The same applies when an implementer had already advanced with a
significant number of other pool contributors to conclude bilateral licences for the
whole pool portfolio.
3. Choosing the bilateral route does not ease the implementer’s obligation to show its
willingness to take a licence throughout the course of the negotiations. In particular,
an implementer’s insistence on bilateral licensing can still indicate unwillingness when
the implementer fails to present comprehensible reasons for its decision to opt for
bilateral agreements, failed to conclude bilateral agreements with the other SEP pool
licensors within reasonable time, and refrained from placing a security. This is even
more true when initially being provided a FRAND pool offer.
landmark
The Hamburg Local Division found the patent infringed, dismissed the counterclaim for revocation and rejected both the exhaustion defence and the FRAND defence of a standard-essential patent implementer. On the FRAND question the Division held that a SEP holder need indicate only one licensing route satisfying FRAND, so an uncontested pool offer discharges its obligation, but that in defined constellations an implementer may demand a bilateral licence instead — provided it gives comprehensible reasons for that choice. The implementer here gave none, concluded bilateral licences with only a fraction of the pool licensors over nine years and placed no security, which together showed it was not genuinely willing to take a licence. The Division expressly declined to follow the LD Munich and the German Federal Court of Justice in treating a missing security as an automatic bar to the FRAND defence, treating it instead as one further indication of unwillingness. Because willingness was absent, the Huawei v ZTE assessment terminated and the SEP holder's own offers were never examined for FRAND compliance.
Stichwörter
Exhaustion, Art. 29 UPCA; FRAND defence, Art. 101 and 102 TFEU
Nichtigkeitsgründe
Art. 138 EPCNovelty
Patent survived (this ground)Art. 54 EPC · Art. 138(1)(a) EPC
“The novelty attack over HLCC 7 failed: that document discloses smoothing across frequency within one frame, not an interpolation between two temporally consecutive upmix parameters, so feature groups 1.2 and 1.3 are not clearly and unambiguously disclosed [148]-[159].”
Inventive Step
Patent survived (this ground)Art. 56 EPC · Art. 138(1)(a) EPC
“All obviousness attacks failed. HLCC 7 gives no pointer and teaches away from amplitude interpolation; neither HLCC 9 nor HLCC 10 concerns upmix parameters; and HLCC 11's separate interpolation of real and imaginary parts is the very linear interpolation the patent criticises [162]-[183].”