2025-09-04 - LD Munich - Imi Hydronic Engineering et al. v. Imi Hydronic Engineering et al.
- Datum:
- Spruchkörper:
- Court of First Instance - Munich (DE) Local Division
- Art:
- Application Order
- Parteien:
- Belparts Group N.V.
Kernaussage: An application to hear a counterclaim for infringent and an infringment action together is denied.
2025-09-04 - LD Munich - Imi Hydronic Engineering et al.
v.
Imi Hydronic Engineering et al.
An application to hear a counterclaim for infringent and an infringment action together is denied.
notable
JR Zigann (Munich LD) rejected a consolidation request under R. 302.3 RoP to hear a counterclaim for infringement from the CD Paris together with the infringement action at the Munich LD. The prerequisite that both proceedings are before the 'same' division was not met. The court noted the CD Paris hearing was scheduled before the Munich LD hearing, and that a shared TQJ (Perronace) on both panels would ensure consistent decisions.
Stichwörter
hearing together, parallel proceedings, R 302.3 RoP