2025-05-15 - LD Munich - Imi Hydronic Engineering et al. v. Imi Hydronic Engineering et al. - UPC_CFI_801/2024; UPC_CFI_392/2025

Aktenzeichen:
UPC_CFI_801/2024; UPC_CFI_392/2025
Datum:
Spruchkörper:
Court of First Instance - Munich (DE) Local Division
Art:
Proceeding Order
Parteien:
Belparts Group N.V. v. IMI Hydronic International SA, IMI Hydronic Engineering AB

Kernaussage: .

2025-05-15 - LD Munich - Imi Hydronic Engineering et al. v. Imi Hydronic Engineering et al. - UPC_CFI_801/2024; UPC_CFI_392/2025
🏛️Court of First Instance - Munich (DE) Local Division• Proceeding Order
📅2025-05-15
🔢UPC_CFI_801/2024; UPC_CFI_392/2025
Parteien & Vertreter
UPC_CFI_392/2025
Kläger / Berufungsführer
IMI Hydronic Engineering International SA
IMI Hydronic Engineering AB
Clemens BAUER
Beklagter / Berufungsbeklagter
Belparts Group N.V.
Tobias WUTTKE
UPC_CFI_801/2024
Kläger / Berufungsführer
Belparts Group N.V.
Tobias WUTTKE
Beklagter / Berufungsbeklagter
IMI Hydronic International SA
IMI Hydronic Engineering AB
Clemens BAUER
📋ORD_69274/2024
⚖️Infringement Action
🌐English

.

In this procedural order, the Munich Local Division decided to continue with the infringement action and the counterclaim for revocation and scheduled the interim conference.
Stichwörter
scheduling

Entscheidung teilen

Weitere Navigation
Entscheidungen
Rechtstexte
Analysen

Zu Sammlung hinzufügen

0 Einträge hinzufügen zu:

Anmeldung

Registrieren